03/20/2026
The two bathrooms we have at the new studios are in the center of our overall floor plan. This requires us to move the doors from one wall to a different wall, while keeping them ADA compliant. I love recycling and reusing materials, so the existing solid core bathroom doors will get moved, sanded, fixed with some bondo, and repainted. We cleaned out all the mold at the very bottom of the bathroom walls, replacing it with new drywall, I’m guessing from an old leak (toilet overflow or something). When done they will be bright, modern and CLEAN, just like the bathrooms at our previous studios! Still getting all our prep work done before ordering and building the new rooms.