02/11/2025
Today is Monday, February 10th, 2025.
Welcome to the NEW Poolesville High School Auditorium.
Designed by VMDO Architects and constructed by Dustin Construction and their many (many) sub-contractors, this Auditorium has been gutted, reconstructed, and now updated to the modern era, featuring electronic stage control systems, a fully digital sound and lights system, a built-in intercom system, telescoping stand seating in the back two houses, a functional paint sink, a sleek black and wood design, and so much more.
More than the physical aspects, Poolesville has got its place for community back, which has been missing since late-May 2023. The PHS Midnight Players is back, better than ever, for Little Shop of Horrors, our Spring 2025 Musical!
Alums, what is a phrase of wisdom you have for those in Theater? For those at Poolesville, what are you looking forward to in this new space?
Welcome back!
PC: Arjun Rao from May 2023, March 2024, and February 2025.
---
Many elements are still being installed, such as the curtain control system. More finalized photos will be released in a couple months with the fully ready space, including photos of further areas.