10/25/2022
The story continues…!
Day 3 of our build - Rope day! This was the day we put up the ropes. We thought today would be an easy and fun day. But turned out, it was the most labor-intensive day. The ropes required a lot of strength to pull and tighten. Our on-site build lead Hadar was the main person setting up the ropes. He spent a lot of his energy tightening the ropes all day. Not an easy day for Hadar!
Fortunately, a group of our friends stopped by and volunteered to help. Instantly, our crew doubled in size and we were able to get a lot done while having loads of fun together.
The org also sent a trencher and Wingman Dan to help us lay down the power cable. We got to finally connect our lighting to our generator. (I’ll give you an overview of our light design in a later post)
We thought we would be able to finish the build today but the process took way longer than we thought. We managed to put up two-thirds of the ropes (we have 500 meters total). Tomorrow is Monday when Burning Man officially starts. We plan to put up the rest of the ropes tomorrow and finish the build!