Another Make Over Interior

Another Make Over Interior Renovation

Completed project Project Name : Concerto North KiaraStyle : Modern Minimalist Inclusive of:-Electrical Works -Ceiling W...
15/12/2022

Completed project
Project Name : Concerto North Kiara
Style : Modern Minimalist

Inclusive of:
-Electrical Works
-Ceiling Works
-Plumbing Works
-Carpentry Works
-Painting Works
-Carpentry Works



Contact me for more information 🙂

Office renovation 60% complete. 40% coming up~~
06/09/2018

Office renovation 60% complete.
40% coming up~~

Renovation started processing of change..
20/08/2018

Renovation started processing of change..

Upcoming project! Old shoplot turned modern office. Stay tuned!
15/08/2018

Upcoming project! Old shoplot turned modern office. Stay tuned!

Metal stud frameworks are versatile in that insulation can easily be incorporated within the structure and plasterboard ...
15/08/2018

Metal stud frameworks are versatile in that insulation can easily be incorporated within the structure and plasterboard can be applied to produce a cost effective solution to building a new internal partition wall, lining or ceiling, or to improving and upgrading any existing wall or ceiling.

Renovating is not for the faint hearted. Things will go “wrong”, it will take time and it will be messy. If you don’t li...
19/10/2017

Renovating is not for the faint hearted. Things will go “wrong”, it will take time and it will be messy. If you don’t like the sound of these things – don’t renovate!

However if you are super keen and just can’t wait to get started make sure that you have covered off the following things before you make a start.

Firstly, take a deep breath… then ask yourself the following questions.

Why are you doing this renovation?
It is vital that you know the objective of the renovation before you start as this will help you keep on track and make the appropriate decisions once the work has started. The objective may be any one of the following:

increase rental return; improve capital value
own enjoyment
keep up with the next door neighbours
provide an income when property is flipped (ie: purchased, renovated and then sold in a short period of time)
or something else which is important to you.
What do you want it to look like at the end?
Some people are blessed with being able to see the end vision of the renovation before it starts. If this is you, great – just write it down so you don’t loose track of your vision throughout the process.

If you don’t have this skill, spend some time thinking about what you want it to look like at the end. Write all of the things that come to your mind in point form. Sort through the points and put them in order of how important they are to you. If visual things aren’t your cup of tea at all – get your plans drawn in full colour and 3D style – you can easily do this through an online service such as elance.com or through your architect/draftsman/builder.

Also, be clear about the details – do you want every gap filled prior to painting, must every corner be exactly 90 degrees? Think about what tolerance level you are happy with. If one paver out of 50 is 3mm out of line, is this OK or do they all have to be within 1mm of each other? Bear in mind, the more exact you want the finished look the higher the cost – simply because the extra amount of time required to get something 1mm perfect compared to 3mm perfect will be approximately doubled.

If you don’t know what you want it to look like at the end, how can you possibly expect your tradesmen to deliver from their end as you need to communicate to them what you want?

How do you want to feel when it is done?
It’s one thing to know what you want it to look like at the end, quite another to know how you want it to feel. Are you looking for the place to be warm, inviting, cool, invigorating? Again, take some time and write these things down. Work out which things are the most important to you.

Equally important is to write down how YOU want to feel at the end of the process. Proud, happy, excited, brimming with pride? How are you going to reward yourself when the project is completed? A glass of champagne, a party, weekend away, dinner out, open a bottle of special wine, a round of golf? Write this down and make sure you follow through with your reward once you have finished. You have earned it! Remember to thank your tradesmen as well at the end – payment is one thing, a big thank you goes a long way!

What are you going to give up so you can get the renovation done on time?

Renovations take time and effort. It has been estimated, by online services provider WhoCanDo, that:

11 hours: the average time it takes between the decision to engage a tradesperson, agreeing to a contract and getting the tradie to your front door takes
47 minutes: the time it takes just putting together a list of tradespeople to call
2 hours: the time it takes to make first contact and then develop a shortlist
7.4 hours: the time it takes to make appointments and arrange on-site visits for quotes
97 minutes: the time it takes to review quotes, ask questions and make comparisons
27 minutes: the time it takes to sign on the dotted line
This is for one tradesman...

So if you need 10 tradesmen and suppliers to complete your home or property renovation, you need to allow at least 110 hours of your time, just to get them started, let alone check that the work gets done when you want it to be done and to your satisfaction. It is our experience that the actual project management of a 4 week job takes approximately 150 hours over a six week period.

So unless you have a spare 25 hours per week to spend on the renovation, the question you need to ask yourself, before the renovation starts is “what am I going to give up in order to allow me the time I need each day to deal with the renovations”? You will need to spend time on the following items during the renovation;

problem solving
purchasing items
obtaining items
co-ordinating tradesmen and suppliers
checking the quality of the work
paying accounts
scheduling the works
If you haven’t – what are you going to outsource so that you have the time available to deal with these issues which will occur? Perhaps you can get a PA or a housekeeper or a nanny for the renovation duration to assist with housework, financial items, children pick ups and drop offs. Whatever it is for you, put things in place before the renovation starts.

What processes do I need to have in place before work starts?
Be really clear about what you want done and how. Work out what is most important to you – getting it done on time, or getting it done “right”, looking good at the end. Make sure that you communicate this to the people you employ.

You need to have ticked all of the following boxes before you start

Do you need a permit(s) for the work you are about to engage in? The best place to start with answering this question is by contacting your local council. If the answer is yes – get the appropriate permit(s).
Have you employed the appropriate people to do the work? (are they registered building practitioners, do they have public liability and home owners warranty insurance, can you sit down and have a cup of coffee and a chat with them?)
Have you set realistic start and finish dates?
Have you got the funds for the renovation? Work out your cash flow requirements over the renovation period so that you can pay your tradesmen on time and still have food on your own table
If you are living in the property as well, have you thought about what hours you want tradespeople to be there (weekdays only, not before 8am, not after 5pm) and have you specified what type of cleanliness standards you require? Do you have a communication book where they can write queries down and you can respond and vice versa?
Have you worked out how people are to access the site – who will let them in, will you use a key safe lock or give set of keys given to the site manager? What security measures do you have in place?
Do you have a contingency plan? What is it?
What do you need to shift/move before works start so that the tradesmen have room to carry out their job?
Share your objective, vision and feel with your tradesmen before they start work – so that they share your vision and know what is important to you as well.

Exclusively & Premium quality Check it out more design from Home decor design... 😘
19/09/2017

Exclusively & Premium quality Check it out more design from Home decor design... 😘

06/09/2017

Metal Cutting Job
Gate/House plate/living room partition/ceiling decorations.

24/05/2017

New house number plate design

***PM US TO GET INSTANT REPLY :) ***

Welcome Home :) This modern wall address planter adds flair and style to your home, inside or out! Hang just one or hang in a grouping to create dramatic visual impact. Looks particularly great with colorful succulents & flowers.

Each planter has a rectangle hollow on the back so it easily slides into the custom metal bracket.

Material : Mild Steel (2mm)

Overall size (cm) : 43L x 26W

Planting box (cm) : 24L x 8.5H x 7.6W (includes small drainage holes)

Planter Color (Powder Coated) : (1)glossy white (2)black texture

Digit Color (Powder Coated) : (1)glossy white (2)black texture (3)metallic gold

**Plant & Succulents are not included**

06/05/2017