08/26/2026
You can’t make an omelet without breaking a few eggs. Finally, Duke Energy ran power lines to the studio. It may be a week before power is connected, but at least we’re one step closer. Maybe someday we’ll install power to the red storage building we call the barn, since a meter box is so close. 🤪