14/11/2025
After the dust settled on two sold-out nights with Severina in Zagreb Arena, we’re excited to lift the curtain and give you a full technical breakdown of our setup.
At IVAS Group we handled lighting, audio, and video across the entire production and here’s how we did it:
Lighting Setup
• Over 200 lighting fixtures deployed to sculpt the stage, audience space and visual atmosphere.
• Featuring top-tier moving-heads: the Martin MAC Viper XIP — high output, full featured.
• Additional fixtures from Tambora Batten LED battens
• Sharpy X-Frame (beam effects).
• Claypaky Mini-B (wash/beam), ClayPaky Midi-B + SGM Q-8 (powerful LED flood/strobe/blinder hybrid)
• Lighting design and programming were executed by and on ChamSys MQ250M console — our command center for cues, effects, and timing.
Video
• Massive LED screen: ≈ 250 m² of the latest LED surface.
• Pixel pitch: 3.9 mm (for high-resolution visuals on a large format).
• Integrated video content, stage backdrops, audience side elements – fully synchronized with lighting and audio.
Sound
• Around 100 speaker cabinets deployed, delivering immersive audio throughout the arena.
• System: .acoustics.official K1, K2 and Kara line-arrays — industry-leading touring systems.
• High-definition, high-impact sound design tailored for live vocals, band + backing tracks, show effects and audience interaction.
Other Key Specs
• Stage footprint: ~ 450 m² (allows for performance zones, band area, video screen integration).
• Rigging: more than 90 rigging points across the venue (for lights, video, audio flown elements).
• Logistics: 8 truckloads of equipment
• Crew: Over 50 team members + external partners (runners, rigging crew, content/video team, sound crew).
We’re proud of this setup and of the team who made it happen. Stay tuned for more behind-the-scenes from IVAS Group and we’re already looking ahead to the next production.
📸