QIC Queensland Industrial Coatings

QIC Queensland Industrial Coatings Yard and Onsite Abrasive Blasting, Protective Coatings, HP & UHP water jetting up to 43,000psi, Scaffolding, Coating Inspection

Boys smashing another pipeline for APA Group Sturt Plateau Pipeline in the Beetaloo basin NT
03/10/2025

Boys smashing another pipeline for APA Group Sturt Plateau Pipeline in the Beetaloo basin NT

When pipeline owners and constructors are looking for a coating company with national and international reach, a proven history of over 4000+km of coated pipeline, equipment that is capabable of any terrain and Australia's harsh conditions, excellent record of safety compliance and most important of...

The crew has successfully completed another pipeline project. Congratulations to all individuals involved for their hard...
16/09/2024

The crew has successfully completed another pipeline project. Congratulations to all individuals involved for their hard work and dedication to achieving excellent results.

another job done and dusted in record time. thanks to Nacap Pty Ltd for entrusting us for your blasting and painting on the Atlas to Reedy creek pipeline and…

14/01/2023

Well that's the end of another pipeline.

580km of 12" pipe.

32,000L paint
230T garnet
25,000+ field joints
Over 19,000 man hours
0 MTI
0 NCR's

NGI Pipeline done and dusted well done to everyone involved you have done an exceptional job as always. The quality that was produced is second to none.

If you need a pipeline coated efficiently and safely with repeatable quality results automated is the only way to go..

Well done guys.

We were awarded the recoating of the Ephraim island bridge, this bridge we coated 16 years ago so it was long over due f...
15/03/2022

We were awarded the recoating of the Ephraim island bridge, this bridge we coated 16 years ago so it was long over due for some love..

We were responsible for coating everything from lights to piers and for all access and transport management

Job was completed August 21 using Wattyl products.

15/03/2022

Quick visit to site and as usual the boys are killing it..

Using our new automated machine the potential for back breaking manual labour injuries has been eliminated as well as having to try and do such a job in the 40-55 degree Pilbara heat would be a recipe for a number of heat stress victims....

Not only can this small crew of 12 achieve the production of a 30man crew they are doing it with ease and repeatable quality.

Keep up the great work guys your great quality safety and production are second to none in the pipeline coating

This is the FMG Iron Bridge pipeline project being constructed by our very close friends at MPC Kinetic

Well it was a busy end to 2019 and seems like this year is going just as quick as we are over half way through January.....
16/01/2020

Well it was a busy end to 2019 and seems like this year is going just as quick as we are over half way through January..

We sprayed some polibrid 705 on a couple of tanks heading for a coal mine.

I flew to canada for a qualification trial with our Canadian partners for automated field joint coating

The boys have been hard at it for Santos in SA and SW queensland getting great results and feed back from the client for the past 5 months

As usual there was heaps of pipeline work for APA Group

Completed a tank for logan city council

Assisted pensar with a tank at gatton

And my last job for 2019 was back at tennant creek. Just cant seem to stay away from that place been there every year for the last 3 years

Still completing onsite works at the airport for the past 2.5 months

And finally it was my parents 60th wedding anniversary, why is this work related? Dad (kev sharman) was the founder of QIC back in 1993..

Another little water pipeline at stone's corner we were required to fix.. this pipe is a major supply (and only supply) ...
21/09/2019

Another little water pipeline at stone's corner we were required to fix.. this pipe is a major supply (and only supply) to a number of suburbs and before blasting we knew there may be some problems.. after blasting and NDT there were a number of areas which we blew through due to the amount of rust and some where steel thickness was less then 20% remaining. We were responsible to getting all leaks fixed using our close friends at ASME..

Earlier in the year we completed APA agnew gas pipeline on behalf of McConnell Dowell. 6" 25km.. being only a very small...
21/09/2019

Earlier in the year we completed APA agnew gas pipeline on behalf of McConnell Dowell. 6" 25km.. being only a very small pipeline our larger main line rigs missed out on this adventure to WA

18/03/2019

Another pipeline completed in the centre of Australia.. can now say we have done the tanami rd in NT.. Great job to the boys on completing this job ahead of time and with superb quality as always Aaron Greg Andrew Gaz Tony Simon Richard Jason Gus Marcelo Luke Barry Zebulon Steve

30/09/2018

another pipeline almost complete in Australia. mainline coating all but complete and tie-ins to be completed in the coming month.. this is a 34km 20" Gas pipeline in western Queensland..

Address

Po Box 7003
Hemmant
4174

Alerts

Be the first to know and let us send you an email when QIC Queensland Industrial Coatings posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Establishment

Send a message to QIC Queensland Industrial Coatings:

Shortcuts

Share